specification list

The pre-plumbed Tribune HE System is manufactured from high grade materials inside and out, offering exceptional performance and reliability.

ISO 9001:2000 Quality assured assembly

> Consistent electrical and plumbing layout
> Brazed pipework fabrication
> Neat and tidy layout
> Pre-wired and pre-plumbed

Separate Central Heating and Hot Water Configuration

> 22mm motorised valve to radiator circuit
> 22mm motorised valve to coil heat exchanger
> Wiring centre
> Seven day programmer and room thermostat with timed Domestic Hot Water (DHW) control
> Hot water temperature thermostat

High Performance Configuration

> Automatic bypass valve
> 3 speed circulator pump with high quality isolating valves
> Balancing valve
> 22mm cold water combination valve (supplied loose)
> Combined expansion valve/check valve housing
> 22mm of 3/4" BSP hot outlet to taps
> 22mm primary flow
> 22mm primary return
> Immersion heater with integral thermostat and thermal cut-out
> Drain cocks
> Comes complete with central heating expansion vessel pack and pressure gauge, as per inset shot below

Comprehensive Safety Controls

> Temperature and pressure relief valve operating at 90oC / 10 bar
> 22mm tundish outlet
> High limit hot water thermal cut-out

Back | Next

© 2006 Range Cylinders Limited.