using Tribune HE units in parallel

For applications where very high flow rate or larger amounts of storage are required two or more Tribune HE units can be linked in parallel.

When linking two cylinders a serparate cold feed is taken to each one and the outlets are joined together. The flow rate available doubles (subject to the cold main).

The demand for hot water will vary considerably between types of buildings and the activities taking place there.

For example:

An office building will require small quantities frequently to many outlets during normal & overtime office hours.

A factory production line will have a peak demand at the breaks in the shift or at the end when the work force may all want to wash their hands simultaneously.

A Sports Pavilion will need to be able to provide large quantities of hot water for the teams showering needs over a short period of time after the game.

So your selection must take into account a number of things:

1. The maximum simultaneous hot water demand

2. The total hot water demand required

3. The required system reheat time

< Back to Tribune HE | Next

© 2006 Range Cylinders Limited.